Runwal Garden City offers affordable 1-3 BHK apartments in Dombivli East with RERA registration, 4 towers of 32 floors each, and possession scheduled for May 2027.
- 1 BHK, 2 BHK, 3 BHK apartments available
- New launch with possession in May 2027
- RERA registered (P51700052561)
- 4 towers, 32 floors each, 1,186 units
- Spread over 0.65 acres in Dombivli East
- Gymnasium, swimming pool, clubhouse, 24x7 security
Property details
Configuration
- Configuration
- 1 BHK
- Property type
- Residential
- Project category
- residential
Building & layout
- Power backup
- Full
Move-in & status
- Status
- UNDER CONSTRUCTION
- Possession
- May 2027
Floor plans
About this listing
Runwal Garden City Thane Outskirts is a RERA-registered project with registration number P51700052561. Runwal Garden City Dombivli East has 4 towers, with 32 floors each and 1186 units to offer. Spread over an area of 0.65 acres, Runwal Garden City Dombivli East, Thane is one of the spacious projects in the Thane Outskirts region.
The internal and external development of Runwal Garden City is currently in progress and will be ready in due time. The construction at Runwal Garden City Dombivli East, Thane is in full swing and most of the units are already sold.
Dombivli East is one of the prime locations to own a home in Thane Outskirts. It has a promising social and physical infrastructure and evolving neighbourhood. Dombivli East, Thane has good connectivity to some of the important areas in the proximity such as Kalyan-Shil Road, Proposed Manpada Metro Station, and Dombivali Railway Station.
Location
Located in Dombivli East, Thane Outskirts on Kalyan-Shilphata Road, Runwal Garden City has good connectivity to Kalyan-Shil Road, the proposed Manpada Metro Station, and Dombivali Railway Station, offering convenient access to key transit points.
Living in Dombivli East
Dombivli East is an affordable, well-connected eastern suburb of the Kalyan-Dombivli twin city (Thane district, Mumbai Metropolitan Region), built around Dombivli railway station on the Central Line and the long-established Dombivli MIDC industrial belt.
Upcoming Metro Lines 12 and 5 and the newly opened Navi Mumbai International Airport should further improve connectivity, though rush-hour crowding, road congestion and industrial pollution around MIDC remain ongoing concerns.
- Direct Central Railway access via Dombivli, Thakurli and Kopar stations connects residents to Thane, Navi Mumbai and Mumbai; Dombivli station is one of the line's busiest, handling 300,000+ daily commuters.
- Relatively affordable compared to Thane and Mumbai, making it a steady draw for first-time buyers and renters seeking 1-3 BHK homes.
- A long-established MIDC industrial belt (since 1964) gives the locality its own local job base rather than being purely a bedroom suburb.
- Strong social infrastructure: schools like Shantinagar School and Tilak Nagar Vidya Mandir, K.V. Pendharkar College, multiple hospitals and malls like Lodha Xperia and Metro Junction are all close by.
- Metro Line 12 (to Taloja/Navi Mumbai) and Metro Line 5 (Thane-Bhiwandi-Kalyan) are under active construction and expected to cut commute times sharply once operational.
- Well-laid arterial roads - Kalyan-Shilphata Road, Manpada Road and the Thane-Dombivli link road - give quick access to NH-3, NH-4 and Thane-Belapur Road.
- Kalyan-Shilphata Road sees heavy peak-hour traffic, and Dombivli station's suburban locals get severely overcrowded during rush hours.
- Low-lying pockets such as Tilak Nagar are prone to waterlogging in heavy monsoon downpours.
- The adjoining Dombivli MIDC belt has a history of air, water and soil pollution from chemical units, with pollution-control clean-up still ongoing.
- Population density in parts of Dombivli East is very high, adding pressure on roads, drainage and open/green spaces.
Dombivli East sits on the Central Line at Dombivli, Thakurli and Kopar stations, with Kalyan Junction ~4 km away; Dombivli station is one of the busiest, handling 300,000+ commuters daily. SH-76 (Kalyan-Shilphata Road), Manpada Road and the Thane-Dombivli link road connect to NH-3, NH-4 and Thane-Belapur Road.
Two MMRDA metro corridors are under construction nearby: Line 12 (Kalyan-Dombivli MIDC-Taloja, linking to Navi Mumbai Metro, due ~2028) and Line 5 (Thane-Bhiwandi-Kalyan, phase 1 targeted late 2026). Navi Mumbai International Airport opened Dec 2025.
Dombivli East has a dense network of schools such as Shantinagar School, Tilak Nagar Vidya Mandir High School, DNC High School and Manjunatha Vidyalaya, alongside numerous CBSE/ICSE/state-board options and coaching centres spread across the locality. For higher education, K.V.
Pendharkar College of Arts, Science & Commerce is a well-established institution near the MIDC office.
Dombivli East is anchored by the Dombivli MIDC industrial area, established by the Maharashtra Industrial Development Corporation in 1964 across Phase I and II on the Kalyan-Shil and Kalyan-Dombivli roads, with demarcated industrial, commercial and residential zones.
This long-standing base of chemical, engineering and manufacturing units has been a major driver of local employment, complementing retail and commercial activity around the railway station.
Within Dombivli itself, the Khidkaleshwar Mandir - a Shiva temple on the banks of Khidkali Lake, rebuilt in the 17th century - is a notable heritage site. Neighbouring Kalyan has Durgadi Fort (1694), a Maratha-era fort with a temple and mosque where Shivaji built his first naval dockyard, about 4 km away.
Around 14 km away, Titwala's Siddhivinayak Mahaganapati Temple, listed among Maharashtra Tourism's heritage destinations, draws lakhs of devotees during Ganesh festivals.
Retail and leisure needs are served by Lodha Xperia Mall and Metro Junction Mall in the Kalyan-Dombivli belt - both large shopping and entertainment destinations - along with local eateries and markets around the railway station.
KDMC has also worked on civic recreational venues, including sports facilities and an auditorium, for the twin city.
Civic services are run by the Kalyan-Dombivli Municipal Corporation (KDMC). Water is drawn largely via pipeline from the Barvi Dam, with the state periodically working to augment bulk supply for the growing twin city.
Parts of Dombivli East see high population density and monsoon waterlogging, while the Maharashtra Pollution Control Board has been engaged on air, water and soil pollution linked to MIDC's chemical units, alongside peak-hour congestion on key arterial roads.
Project & building
Questions about this listing
Got a question about this listing? Ask Deewan directly — your number stays masked until they reply, and you get a structured answer back on WhatsApp.
Runwal Gardens , Manpada, Kalyan - Shilphata Rd, Kalyan, Dombivli, Maharashtra 421204
About Runwal Group
Similar listings nearby
11 photos
1 photos
1 photos
More from Deewan
6 photos
5 photos
6 photos
5 photos
6 photos
4 photos
6 photos
3 photos
4 photos
6 photos
Frequently asked questions
What is the RERA registration number for Runwal Garden City?
Runwal Garden City is RERA-registered with registration number P51700052561.
When is the possession expected for Runwal Garden City?
Possession is scheduled for May 2027.
How many towers and units does Runwal Garden City have?
The project has 4 towers with 32 floors each, offering 1,186 units in total.
What BHK options are available at Runwal Garden City?
1 BHK, 2 BHK, and 3 BHK apartments are available for sale.
What amenities are available at Runwal Garden City?
Amenities include gymnasium, swimming pool, clubhouse, 24x7 security, visitor parking, power backup, lift lobby, garden, cycling track, cafeteria, waste composting, network connectivity, piped gas connection, rain water harvesting, water storage, amphitheatre, game area, kids playing area, medical service, and concierge service.
What is the location and connectivity of Runwal Garden City?
Located in Dombivli East, Thane Outskirts, it offers connectivity to Kalyan-Shil Road, the proposed Manpada Metro Station, and Dombivali Railway Station.