3 BHK apartment on floor 1 of EDEN by Wave City, a 31-floor gated project with RERA-registered status (UPRERAPRM5538) and possession slated for June 2029.
- 3 BHK apartment, Super built-up area: 1750 sq ft, north-east facing, semi-furnished
- RERA registered (UPRERAPRM5538); OC and CC applications are pending
- Possession date: 30 June 2029; project launched 3 October 2024
- Gated society with 24x7 water supply, power backup, CCTV and visitor parking
- Amenities include gym, swimming pool, club, jogging track and kids play area
- Nearby metro, highway access, schools and hospitals; vaastu-compliant, pets allowed
Property details
Configuration
- Configuration
- 3 BHK
- Property type
- Apartment
- Project category
- residential
- Bath · balcony
- 3 · 1
- Furnishing
- Semi-furnished
Area & dimensions
- Super built-up area
- 1,750 sq ft
Building & layout
- Floor
- 1 / 31
- Facing
- North-East
- Vastu facing
- North-East
- Power backup
- Full
- Water
- 24×7
- Pets
- Pets allowed
Move-in & status
- Parking
- 1 covered
- Availability
- Beyond 60 days
Configurations 4
| Configuration | Area | Price | Availability |
|---|---|---|---|
| 3 BHK Apartment · Type-1 | Super built-up area: 1,750 sq ft | On request | — |
| 3 BHK Apartment · 3 BHK + servent | Super built-up area: 1,774 sq ft | On request | — |
| 3 BHK Apartment · 3 + servent type 3 | Super built-up area: 1,926 sq ft | On request | — |
| 3 BHK Apartment · 3 + servent type 4 | Super built-up area: 1,951 sq ft | On request | — |
Floor plans
About this listing
presenting a high luxury segment apartments in wave city ghaziabad EDEN by wave 3BHK and 3BHK +S highrise apartments. all morden premium amenities. for more information contact
Amenities
- Lift
- Power Backup
- Water Supply 24x7
- Visitor Parking
- Security
- Cctv
- Gated
- Intercom
- Gym
- Swimming Pool
- Club
- Garden
- Kids Play
- Sports
- Jogging Track
- Shopping Nearby
- School Nearby
- Hospital Nearby
- Metro Nearby
- Highway Access
- Modular Kitchen
- Wardrobes
- Servant Room
- Vaastu
Location
Project & building
Society & building
- Total units in phase
- 400
Construction & timeline
Pricing details
- Booking amount
- ₹ 1 L
Monthly costs & utilities
- Maintenance
- ₹ 4/sqft/mo
- Property tax
- ₹ 17,000 / year
Documents & legal
- Ownership type · Leasehold
- Society NOC · Available
- SBI
- HDFC
- ICICI
- AXIS
- KOTAK
- PNB
- BOB
- IDBI
- YES
- INDUSIND
- LIC_HFL
- HDFC_HFL
Questions about this listing
Got a question about this listing? Ask Ayush directly — your number stays masked until they reply, and you get a structured answer back on WhatsApp.
Wave City
Listed at EDEN by wave city
Similar listings nearby
6 photos
10 photos
Video
1 photos
1 photos
3 photos
6 photos
Frequently asked questions
Is this property RERA-registered?
Yes — RERA registration registered (ID: UPRERAPRM5538).
Where is this property located?
Wave City, Ghaziabad. Project: EDEN by wave city.
Are pets allowed in EDEN by wave city?
Pet policy: allowed.
When is possession of this property?
Possession: Jun 2029.
What is the super built-up area of this 3 BHK apartment?
The super built-up area of this 3 BHK apartment in EDEN by Wave City is 1750 sq ft. This is the area figure supplied for this unit.
Which direction does this apartment face?
This apartment is north-east facing. It is on floor 1 of a 31-floor gated project in Wave City, Ghaziabad.
What is the OC status of this project?
The occupancy certificate (OC) application is pending, and the CC application is also pending. The project is under construction with possession slated for 30 June 2029.
Is this apartment semi-furnished or fully furnished?
This 3 BHK apartment is semi-furnished. The configuration is 3 BHK, 3 bathrooms and 1 balcony.
What amenities does EDEN by Wave City offer?
The society has a lift, 24x7 water supply, power backup, CCTV, visitor parking, security, intercom and gated entry. Listed amenities include a gym, swimming pool, club, jogging track and kids play area.
When was EDEN by Wave City project launched?
The project was launched on 3 October 2024. Possession is scheduled for 30 June 2029, and the project is currently under construction.